ARM has the field experience and knowledge to provide the owner a viable list of potential solutions to his stormwater lake and pond problems. These include the times where the owner is facing some difficult engineering issues. Whether they be for the need of dredging or in the planning stages of laying out a Reserve Study, ARM has worked with some of the finest of licensed firms that are specifically geared for the task.
ARM can be the source for finding those firms and bringing their talents together for a comprehensive package of services that is needed.
Reserve Studies – Most Associations are familiar with this process. It is usually laid out as a five year plan to address certain needs within the community. While Reserve Studies address the community as a whole, when it comes to the needs of the stormwater lake and pond issues, sometimes this subject gets shortchanged. The result is that when an issue occurs, the planned funding is not there. ARM can work with the engineers performing the study to give them a more realistic picture of events to come.
Bathymetric Surveys – Once a decision is made to determine whether to dredge or not, it is agreed the next step is to get a picture profile of the water body in question. ARM works with some of the best engineers that can offer this bathymetric survey into the planning process.
Dredging – There is no doubt that this is the big ticket item in anyone’s book when it comes to the long term lake and pond management consideration. ARM has worked with some of the finest companies that can offer the owner a complete package of solutions – from the permit process to the final disposal, ARM can assist in keeping the process on track.